  • 10-10-2015
  • 01-05-2015
    FIELD has achieved a Contract regarding Supply, Installation and Data Management (WMS) of the Geotechnical and Structural Monitoring System in the new High Speed Railways Torino-Lione - Lot Saint Martin La Porte
  • 01-04-2015
    FIELD has achieved a Contract regarding Supply and Installation of gauges, Topographical Activities, Drillings, Geotechnical and Geomechanical Investigation and Data Management (WMS) of the Višnové new highway tunnel (Slovakia)
  • 01-02-2015
    FIELD has achieved a Contract regarding SW Data Management (WMS) of the new Riyadh Line Package 3 Lines 4, 5 & 6 (KSA)
  • 01-01-2015
    FIELD has achieved a Contract relating to the supply, installation and data management with our WMS of a complex Static, dynamic and topographical monitoring system of 6 buildings adjacent to the workings site of the Bisagno River in Genova (Italy)
  • 30-09-2014
    Field acquire the contract, for the data management with WMS of the third Bosphorus Bridge, Istanbul
  • 01-09-2014
    Field acquired the contract, for design, supply, installation and data management (WMS) of railway platform monitoring system, with RDS and automatic Topographical stations in the construction site in Forlanini street (MI)
  • 11-07-2014
    Field performed Well Logs tests at the metro construction site in Riyadh - Saudi Arabia
  • 01-07-2014
    Field acquired the contract, for theperformance of tests PDI on the buildinsite LNG Project - Angola
  • 01-07-2014
    Field acquired the contract relating to the design, supply, installation and data management WMS of monitoring system of the damOjo de Agua - Honduras
  • 28-04-2014
  • 15-04-2014
    Field performed Well Logs tests at the metro construction site in Doha-Qatar
  • 01-04-2014
    Field acquired the contract relating to the design, supply, installation and data management WMS of monitoring system of the dam Cerro del Águila - Perù
  • 01-03-2014
    Field acquired the contract, concerning the supply and installation of instruments for walls monitoring and the execution of topographic control measurements at the building site of Porta Nuova Garibaldi Hotel-F (MI)
  • 10-01-2014
    Field acquired the contract, for the supply and installation of vibrating wire extensometers in the piles cages and the next load test for the building site of TEEM Lot B
  • 24-10-2013
    Field Srl contributed with their own systems of monitoring in the project to removal of the Costa Concordia
  • 01-10-2013
    Field has performed the tests of Viaducts 2, 2a, 3, 5.1, 5.2 and 6, and 2 of the Gallery of the new SS64 Porrettana
  • 01-08-2013
    Field acquired the contract, for the supply and installation of equipment for monitoring civilian works of the viaduct Serio and Oglio for the new High Speed ??- CEPAV 2
  • 01-08-2013
    Field acquired the contract, for the supply, installation and management of data instrumentation for structural monitoring of the new car park of St. Giusto - Trieste
  • 23-07-2013
  • 06-04-2013
    Field has acquired the contract for the supply and installation of geotechnical instrumentation for monitoring in the town of Acicastello (CT)
  • 03-04-2013
  • 21-02-2013
  • 21-02-2013
  • 14-02-2013
    Field is performing the installation of a control system for structural monitoring with manual and automatic reading system for the construction of the new underground car park on the harbor of Nice (France)
  • 14-01-2013
    Field has acquired the contract for the supply and installation of a system for remote monitoring data of dams Giacopiane - Pian Sapejo - Osiglietta
  • 01-11-2012
    Field participates through its monitoring systems and data management to recovery operations of the cruise ship Costa Concordia
  • 01-10-2012
    Field has acquired the contract for the execution of No.10 static load tests on the foundation piles for the new Mosque of Algiers-Algeria
  • 01-10-2012
    Field has acquired the contract for the supply, installation and management of data on our web portal WMS, inherent  the system of monitoring of the buildings adjacent to the Torrent Chiaravagna - Genoa
  • 01-07-2012
    Field acquired the contract for the execution of a system for elevation monitoring of the surface of the tract for the new line is MM5 - Milan
  • 01-03-2012
  • 01-03-2012
    Field acquired the contract, concerning the restoration and maintenance of the monitoring system of dam Castreccioni - Macerata
  • 01-02-2012
    Field acquired the contract, for the supply and installation of instrumentation for geological and structural monitoring including the data management with our system WMS of the Viaduct Fornace
  • 01-02-2012
    Field acquired the contract, for the design of monitoring system of the tracks of the Milan Metro Line 2, in the section between the stations Gessateand farm Antoinette.
  • 01-01-2012
    Field acquired the contract on, concerning the supply and installation of an automatic monitoring system at the viaduct "Micheletti 2"
  • 01-10-2011
    Consortium of Metro Line 1 of Panama, Field by the company owned Monitoriza S.A. has acquired the contract for the supply, installation, measurement and data management through our WMS of the new Line 1 of Panama City
  • 11-07-2011
    Field s through the company Monitoriza SA, acquired the order for Quimbo Dam (Colombia) for the design, supply and installation of geotechnical and structural instrumentation
  • 23-03-2011
  • 10-12-2010
    Field works with Impregilo for monitoring Hidrosogamoso dam (Colombia)
 
 
 
portfolio
YEAR2015
CUSTOMERPontenossa Spa
PROJECTDynamic measurement
ACTIVITYStress dynamyc measurement during loading and unloading stagesof Silos Govoni 2
YEAR2015
CUSTOMERCoopSette
PROJECTSS 64 Porrettana
ACTIVITYPerforming tests of the viaduct VI01 of Lot 1 SS64 Porrettana - Bologna
YEAR2014
CUSTOMERTrevi Angola
PROJECTLNG Project Soyo - Angola
ACTIVITYExecution of dynamics load tests PDA during thedriving of foundation piles
YEAR2013
CUSTOMERCoopSette
PROJECTSS 64 Porrettana
ACTIVITYPerforming tests of the viaducts of Lot 2 of SS64 Porrettana - Bologna
YEAR2012
CUSTOMERPIZZAROTI & C SPA
PROJECTNew stadium in Constantine - Algeria
ACTIVITYPerform dynamic tests in the grandstands and on the covers of the new stadium in Constantine
YEAR2012
CUSTOMERTREVI SPA
PROJECTNew road bridge on Piave river
ACTIVITYPerform static load test on a test pole
YEAR2012
CUSTOMERTREVI SPA
PROJECTNew Mosque of Algiers
ACTIVITYPerforming of vertical and horizontal load tests on foundation piles
YEAR2012
CUSTOMERPIZZAROTI & C SPA
PROJECTNew stadium in Constantine - Algeria
ACTIVITYPerform static tests in the grandstands and on the covers of the new stadium in Constantine
YEAR2011
CUSTOMERTUZI COSTRUZIONI
PROJECTNEW RAILWAY OVERPASS ON LINE VARESE-LAVENO
ACTIVITYLoad tests on the overpass slab
YEAR2011
CUSTOMERCONSORZIO BBM
PROJECTBRE.BE.MI
ACTIVITYSpecial tests for testing precast reinforced pilasters
YEAR2011
CUSTOMERTUZI COSTRUZIONI
PROJECTNEW RAILWAY OVERPASS ON LINE VARESE-LAVENO
ACTIVITYLoad test on pile
YEAR2011
CUSTOMERNODAVIA CONSORTILE
PROJECTNEW HW TRAIN STATION FLORENCE
ACTIVITYLoad test on piles
YEAR2011
CUSTOMERTREVI ANGOLA
PROJECTPile Driving Angola
ACTIVITYDynamic tests during the beating of foundation piles
YEAR2010
CUSTOMERPDT & CLF
PROJECTRoma Metro C
ACTIVITYDynamic tests with vibrodina and static tests with LVDT transducer
YEAR2010
CUSTOMERVIPP LAVORI
PROJECTShopping Center Clermont Ferrand (France)
ACTIVITYStatic load tests on pile foundation
YEAR2010
CUSTOMERGarbi MM5
PROJECTMM5
ACTIVITYTests with pressure cells
YEAR2010
CUSTOMERR.C.T. Srl
PROJECTBridge on Stretto di Messina
ACTIVITYEnergy test SPTL
YEAR2010
CUSTOMERFerrovienord Milano
PROJECTLambrone bridge
ACTIVITYStatic tests with mini strain gauges
YEAR2009
CUSTOMERBaldassini & Tognozzi
PROJECTFlorence
ACTIVITYLoad test on pile
YEAR2009
CUSTOMERAttusas
PROJECTSan Pellegrino Terme
ACTIVITYPumping Test
YEAR2009
CUSTOMERIstria Sviluppo S.r.l.
PROJECTMalpensa Airport
ACTIVITYDynamic tests on floor
YEAR2009
CUSTOMERIstria Sviluppo S.r.l.
PROJECTMalpensa Airport
ACTIVITYTests on floors
YEAR2008-2009
CUSTOMERCLODIA S.c.a.r.l.
PROJECTBocche di Chioggia
ACTIVITYPile Driving
YEAR2008
CUSTOMERTREVI Construction S.p.A.
PROJECTAngola
ACTIVITYPile Driving
YEAR2008
CUSTOMERFERROVIE NORD
PROJECTPonte Langosco
ACTIVITYDynamic and static tests
YEAR2008
CUSTOMERFondater Pali
PROJECTPonte di Legno
ACTIVITYDrainage test
YEAR2007-2008
CUSTOMERBetonvilla
PROJECTLecco
ACTIVITYLoad Tests on foundation poles
YEAR2007
CUSTOMERFERROVIE NORD
PROJECTPonte Ticino
ACTIVITYDynamic and static tests
YEAR2006
CUSTOMERVITALI S.p.A.
PROJECTPonte strallato a scavalcamento del fiume Adda (LC)
ACTIVITYLoad tests on fondation poles
YEAR2005
CUSTOMERCOMUNE DI MILANO
PROJECTPonte strallato di Certosa
ACTIVITYDynamic tests
 
Field S.r.l. Via delle Rose, 7a | 24040 Lallio (Bg) | Tel +39.035.203471 | Fax +39.035.203448 | info@fieldsrl.it | posta certificata